• Call us on:+86-13813813329
  • Email us:info@meetall-sports.com

Products

  • Spraying compound running track

Spraying Compound Running Track

Spraying compound running track is imported from abroad advanced technology, through specialization, has become popular in our country school track and field stadium

TypeSpraying compound

Color: Red, Green, Blue

Thickness13mm

Basement: Asphalt; Cement

Lifetime: over 8 years

 APPLICATION RANGE:

Suitable for formal athletics, general competitive gameSuitable for all kinds of school field and region( with Climate conditions in minus 16 degrees Celsius above), but not for cold ice region.

Description:

Character:

1. Chemical stability

EPDM granules could be used for kinds of difficult weather condition, with chemical stability, ozone aging and thermal oxidative aging character.

2. Good elasticity

EPDM granules could keep the good elastic even under the condition of low temperature.

3. Vivid colors

All pigment materials which used for our epdm granules are imported from famous company, colors of epdm granules could keep long time, with strong grey scale and uv stability.

4. Good cohesion

With many times of experiments and testing, our epdm granules could be mixed with pu binder totally with good cohesion.

 Construction technique

 1. Base Binder

Clean the ground, and brush the glue at the cement ground.

2. Flexible level installation points

Mix the binder with black granules by standard proportion, and mix the materials totally by mix machine. Install the rubber floor by paving machine; keep the thickness around 8-9mm thick. All these work should be done before the base binder cured.

When finished the installation of paving machine, keep the rubber floor away from the damage. About 24 hours later, when it cured, the flexible level of rubber floor is finished.

3. EPDM level installation points

the binder with colored EPDM granules by standard proportion, and mix the materials totally by mix machine. Install the rubber floor by spraying machine. When finished the installation of spraying machine, keep the rubber floor away from the damage. About 24 hours later, when it cured, the EPDM sparing level is finished